Our team has a long and successful track record of developing tailored, regulatory response solutions for the commercial nuclear industry

The PFES Post-Fukushima Response Project Team has reviewed and understands the recommendations developed by the Near-Term Task Force.  As the details of NEI 12-06 “Diverse and Flexible Coping Strategies (FLEX) Implementation Guide” Tier 2 and Tier 3 requirements are realized, our company is prepared to support the industry’s efforts to improve the safety of US nuclear plants. Our team has a long and successful track record of developing tailored regulatory response solutions for the Commercial Nuclear industry.

PFES can leverage our vast experience to include critical review of fleet diverse and flexible coping strategies ensuring regulatory requirements are being met in a cost-effective manner. Additionally, our project team will support the utility owner to interface with Nuclear Regulatory Commission (NRC) and industry groups in development of generic “FLEX” solutions for both pressurized and boiling water reactors.

PFES Services

  • Program document development
  • Emergency preparedness
  • Spent Fuel Pool Makeup Capability
  • External Hazard Reevaluations
  • Periodic Confirmation of External Hazards
  • Seismically Induced Fires and Floods
  • Venting Systems for Other Containment Designs
  • Hydrogen Control
  • Emergency Response Data System (ERDS) Capability
  • Decision making Radiation Monitoring, and Public Education
  • Reactor Oversight Process (ROP) Updates
  • Training on Severe Accidents
  • Emergency Planning Zone
  • Expedited Transfer of Spent Fuel to Dry Cask Storage
  • Reactor and Containment Instrumentation
  • Project management and other team member support